Real World Maths Busters
The Maths Behind Everyday Life
The story, the formula and a worked example — see exactly where this maths shows up in the world around you.
Technology 3 min read
Why Data Centres Use as Much Power for Cooling as for Computing
PUE measures the overhead.
Power Usage Effectiveness (PUE) is total facility power divided by IT equipment power. A PUE of 1.5 means 50% of the electricity goes to cooling and lighting.
PUE
PUE = total power / IT power.
Data centre using 10 MW for servers
- 1
PUE of 1.5
Total = 10 × 1.5 = 15 MW
- 2
Cooling + overhead
15 - 10 = 5 MW
- 3
Google’s PUE
≈ 1.1 — only 10% overhead
Answer
5 MW just for cooling — half the electricity bill
The takeaway
Every search query uses about 0.3 Wh — and almost half of that is keeping the servers cool.