ACT · Practice Sheet 4
Sheet code: ACT-S04 · 20 questions
- 1.Quantitative Aptitude
A can finish a job in 8 days and B in 16 days. Working together, how long will they take?
- 2.
- 3.Quantitative Aptitude
An item is bought for $900 and sold for $1,260. Find the profit percentage.
- 4.Mathematics
Find the slope of the line through (7, 7) and (-3, 7).
- 5.Physics
A constant force of 79 N moves an object 38 m in the direction of the force. Calculate the work done.
- 6.Mathematics
For the quadratic 4x² + 3x + 9 = 0, find the sum and product of its roots.
- 7.Quantitative Aptitude
Divide $1,500 between two people in the ratio 7:3. How much does each receive?
- 8.Mathematics
In an arithmetic progression with first term 14 and common difference 2, find term number 16.
- 9.
- 10.Quantitative Aptitude
Two varieties costing $36 and $91 per kg are mixed to give a mixture worth $68 per kg. Find the mixing ratio.
- 11.
- 12.Mathematics
Find the sum of the first 6 terms of a GP with first term 6 and common ratio 3.
- 13.Quantitative Aptitude
In how many ways can 3 objects be arranged out of 5 distinct objects? (Find ⁿᴘᵣ for n = 5, r = 3.)
- 14.Quantitative Aptitude
Two varieties costing $15 and $67 per kg are mixed to give a mixture worth $56 per kg. Find the mixing ratio.
- 15.Physics
Find the force required to accelerate a 25 kg mass at 18 m/s².
- 16.
- 17.
- 18.Mathematics
Find the sum of the first 11 terms of an AP with first term 18 and common difference 7.
- 19.Physics
A constant force of 93 N moves an object 39 m in the direction of the force. Calculate the work done.
- 20.
© FormulaWon — formulawon.app · Answers & step-by-step working available on the solutions sheet.